Start or Modify Service
发布时间:2026-09-22 | 浏览:1
Start or Modify Service
How can we help you?
Starting a new business or opening a new branch or office? We're here to help! We can power up your business in 5 easy steps.
These steps only apply to businesses with a contracted capacity of 5 to 499kW and new Meralco facilities are required to energize their property and connect it to the grid.
Prepare the requirements: • Identification documents ☐ Valid ID (for Individual) ☐ SEC Certificate of Registration (for Non-residential) • Electrical load requirements • Occupancy documents • Tax identification documents ☐ TIN ID (for Individual) ☐ BIR Certificate of Registration (for Non-residential) • Authorization letter, as needed
• Identification documents ☐ Valid ID (for Individual) ☐ SEC Certificate of Registration (for Non-residential)
☐ Valid ID (for Individual)
☐ SEC Certificate of Registration (for Non-residential)
• Electrical load requirements
• Occupancy documents
• Tax identification documents ☐ TIN ID (for Individual) ☐ BIR Certificate of Registration (for Non-residential)
☐ TIN ID (for Individual)
☐ BIR Certificate of Registration (for Non-residential)
• Authorization letter, as needed
Submit via these channels: • Meralco Business Centers • My Meralco • Private Electrical Contractors Certified by Meralco*
• Meralco Business Centers
• Private Electrical Contractors Certified by Meralco*
Inspect premises of your home or business to verify the following: ☐ Completeness of home or business facilities ☐ Completeness of wiring system ☐ Distance from the nearest Meralco facility
☐ Completeness of home or business facilities
☐ Completeness of wiring system
☐ Distance from the nearest Meralco facility
Issue yellow card for securing a Certificate of Final Electrical Inspection (CFEI) from the LGU
Secure meter socket from the nearest Meralco Business Center
Install service entrance via PECCBM or electrician and use the yellow card as guide
Update Meralco once installation is complete via the contact details provided
Submit the Certificate of Final Electrical Inspection (CFEI) and other documents
Pay bill deposit via these channels: • Meralco Business Centers • My Meralco
• Meralco Business Centers
Install electric meter and energize service
This will be done in the presence of the customer or authorized representative
Need to update your contract or bill details or upgrade your electrical load? You can easily do that via My Meralco .
Please see requirements below depending on the service modification type:
Authorization letter for customer's representative
Valid government ID of the customer and his representative
Proof of ownership (Transfer Certificate of Title or Deed of Sale or Contract of Lease)
BIR Certificate of Registration
National Statistics Office or local civil registry corrected birth certificate
National Statistics Office or local civil registry marriage certificate
DTI registration
One valid government issued ID of authorized signatory and corporate secretary (with picture and signature)
Board Resolution/ Secretary's Certificate
Latest General Information Sheet (GIS)
Amended SEC documents with Board of Directors
Load Schedule (for addition or reduction of electrical load or remodeling of meter only)*
Single Line Diagram
Location Sketch
One valid government issued ID of authorized signatory and corporate secretary (with picture and signature)
Board Resolution/ Secretary's Certificate
Latest General Information Sheet (GIS)
Amended SEC documents with Board of Directors
* If you are required to provide a building permit in compliance with the CFEI, you need to secure a Power Line Operator (PLO) Certificate from Meralco. The PLO certificate is a requirement for the issuance of building permit, as mandated by the RA 11361 or the Anti-Obstruction of Power Lines (AOPL) Act.
To learn more about this this new government requirement, click here .
Upon submission of requirements, a Biz Customer Service Engineer will coordinate with you within three (3) working days for the next steps.
Closing shop or moving to another location? You may request for the termination of your electric service via My Meralco .
Please see requirements below depending on the service modification type:
Letter of request from owner / authorized signatory
Authorization letter if applicable
Articles of Partnership
Valid ID of authorized signatory
Latest General Information Sheet (GIS)
Secretary's Certificate (authorized representative)
Valid ID of authorized signatory and corporate secretary
Upon submission of requirements via My Meralco , a Biz Customer Service Engineer will coordinate with you within three (3) working days for the next steps.
Service Application Requirements for Businesses
Note: Requirements can be submitted by your selected electrical contractor.
Online Application
Authorized letter for customer's representative
Electrical Plan with Load Schedule, Single Line Diagram, and Location Sketch (signed and sealed by a Professional Electrical Engineer)
Valid Government ID of a customer and representative
Proof of ownership (Transfer Certificate of Title or Deed of Sale or Contract of Lease)
BIR Certificate of Registration
Additional Requirements for Corporations:
SEC Registration with Articles of Incorporation
Latest General Information Sheet (GIS)
Secretary's Certificate (authorized to sign the Meralco contract)
Additional Requirements for Partnerships:
Articles of Partnership
Additional Requirements for Individual/Sole Proprietorship:
Business Permit or Department of Trade and Industry (DTI) Permit
Thanks for staying connected
Get the latest news and service advisories from Meralco.
Help us improve our service. Submit Feedback